Tinkerer's Orchestra! Weeks 6-7
Some notes from our last two weeks of tinkering!
Design time before building the bell box for our bell (resonating tube!):
Lining up the colored tubes before attaching to the ramp:
Getting some ideas for how to attach strings to our ramp:
We picked up the idea to simply string our cord through holes on our ramp. So we pulled out a 1/4 inch drill bit for the job!
Bell box construction:
Building legs for the Fern-o-phone! These cuts required some protractor measurements (based on the structure of our shop saw horses) and a little help from the compound miter saw!
Adding the final wooden blocks to the fern-o-phone!